|

Millennium Cove

,

Millennium Cove– Master Tracker

Millennium Cove– Progress Tracker & Photos

Progress Staus Submission Form

Please enable JavaScript in your browser to complete this form.

Contact Info

Name
Date / Time

Content Details

This info is about
Click or drag files to this area to upload. You can upload up to 20 files.
PROJECT DESCRIPTIONS

BLDG 1
Bldg 1:  4,580sf replace / 1,200sf nail only
Front & rear outside ends (4 total) – 20′ x 10′ = 200sf each / 800sf total replace
Front & rear center section (2 total) – 55′ x 18′ = 990sf each / 1,980sf total replace
Left & right ends (2 total) – 40′ x 18′ = 720sf each / 1,440sf total replace
Left and right gable ends above 2-story sections (2 total) – 30′ x 6′ = 180sf / 360sf total replace
Gables over breezeways/stairs (4 total) – 60′ x 5′ = 300sf / 1,200sf total NAIL ONLY
Total Remove and replace
Total Surface nail area
Less patio and window area
  • Paint Entire Permiter of Buildings (COMPLETE)

    Completed

  • Repair Roofs in 4 Units (IN PROGRESS)

    Units 105, 209, 807, 422

  • Replace Drywall & Doors (COMPLETE)

    Lorem ipsum dolor sit amet, consectetur adipisi cing elit, sed do eiusmod tempor incididunt ut abore et dolore magna

BLDG 2

BLDG 3

  • Paint Entire Permiter of Buildings (including hallways)

    Color — Stone Gray Trim– Ash Blue

  • Repair Roofs in 4 Units

    Units 105, 209, 807, 422

  • Replace Drywall & Doors

    Lorem ipsum dolor sit amet, consectetur adipisi cing elit, sed do eiusmod tempor incididunt ut abore et dolore magna

BLDG 4

takeoff

Please enable JavaScript in your browser to complete this form.

Exterior

Click or drag a file to this area to upload.

Interior

Click or drag a file to this area to upload.
=

One response to “Millennium Cove”